Project Description
Alterations and additions to a Grade II* listed building. The Old Palace was used by the Archbishop of Canterbury to stop over between London and Canterbury in the 16th Century. The works consists of refurbishing the existing dwelling and adding an underground swimming pool. The anticipated completion date is August 2013.
slideshow 1 design development
- 3D Visualisation of pool
- Proposed ground floor
- Block plan
- Site location plan
- Proposed elevations
- Arial view illustrated
- Arial view illustrated
- Illustrated site plan
- Planning conditions
- Planning
- 3D Visualisation of stairway
- 3D Visualisation of stairway
slideshow 2 existing building & construction
- Pool construction
- Site construction
- Pool construction
- Pool construction
- Roof construction
- Pool construction
- Roof construction
- Site construction
- Site construction
- Site construction
- Interior
- Pool house construction
- Site construction
- Site construction in progress
- Interior
- Interior
slideshow 3 project complete
-
Glass floor
-
Underground pool
-
Pool house roof
-
Finished pool house
-
The Old Palace
-
New bathroom
-
New bathroom
-
Pool house interior
-
Interior stairway
-
Stairway
-
Doorway
-
New bedroom
-
Underground pool
-
Pool house ground view
-
Pool house interior
-
The Old Palace & new pool
- Glass floor
- Underground pool
- Pool house roof
- Finished pool house
- The Old Palace
- New bathroom
- New bathroom
- Pool house interior
- Interior stairway
- Stairway
- Doorway
- New bedroom
- Underground pool
- Pool house ground view
- Pool house interior
- The Old Palace & new pool
For more information on this project download our planning conditions document.
[wpdm_file id=5]
















































